Right-left relay is used for 2 different loads, which works by turn.
First load starts working, stops and waits(off) and second load starts.
working. Both working time is same.
Initially first relay is energized. After Ton delay, relay is de-energized.
Both relays are de-energized during Toff delay. At the end of Toll,
second relay stays in this position during Ton. When Ton finished both
relays are de-energized. This cycle is repeated continuously.